- Tunnel Hranjen- Goražde- Bosnia and Herzegovina
(Delivery and supply of self-drilling IBO and SN anchors);
- The second route of the railway line Divača-Koper, Slovenia
(Delivery and supply of MV anchors);
- Bypass of Zalău municipality between DN1F, km 79+625 – DJ 191 C; Bypass Project, Zalau, Romania
(Delivery and supply of anchors, ropes and pre-type pipes for prestressing);
- State road IB category no. 21. Novi Sad-Ruma, Fruškograd Corridor, Serbia
(Delivery and supply of self-drilling IBO, SN anchors and pre-type pipes for prestressing);
- Ruma-Šabac-Loznica highway and expressway, Section 1 and 2, Ruma-Šabac highway, Ruma interchange, Serbia
(Delivery and supply of anchors, ropes and pre-type pipes for prestressing);
- Highway E-763 Preljina-Požega, a section in Čačak, Serbia
(Delivery and supply of ropes and anchors with pre-type tubes for prestressing);
(Delivery and supply of self-drilling IBO anchors); (Diorit supplied a dump truck and a rake for excavating the material from the tunnel);
- Tunnel Ivan – Tarčin-Konjic – Bosnia and Herzegovina
(Delivery and supply of self-drilling IBO and SN anchors);
- Tunnel Ponirak – Zenica – Bosnia and Herzegovina
(Delivery and supply of self-drilling IBO and SN anchors);
- Počitelj Tunnel – Bosnia and Herzegovina
(Delivery and supply of self-drilling IBO and SN anchors);
- Hydrotechnical tunnel Ribnica – Kakanj – Bosnia and Herzegovina
(Diorit supplied the underground drill and loader for excavating the material from the tunnel and the drilling tools);
- Hydroelectric plant Arilje – Serbia – Geosonde – Belgrade
(Diorite supplied the geotechnical rope anchors);
- Project Mrtvica 1, 2 – Serbia – Corridor 10
(Diorit supplied rope anchors, Gewi® bars and self-drilling anchors);
- Slope rehabilitation – Grdelica – Serbia – Corridor 10
(Diorit supplied the self-drilling anchors);
- Predejane Tunnel – Serbia – Corridor 10
(Diorit supplied the rope anchors);
- Corridor Vc – overpasses on the section Svilaj-Odžak – Bosnia and Herzegovina
(Prestressing works);
- Prestressing works on the “Ričice” Bridge – Zenička bypass – Bosnia and Herzegovina
- Bridge “Trebaljevo”– Prestressing works – Montenegro
- Bridge “Bijelo Polje” – Prestressing works – Montenegro
- Pljevlje Mine Basin – (Diorite supplied self-drilling anchors) Montenegro
- Construction of the port “Kostolac” – (Diorit supplied rope anchors, Gewi® bars 950/1050) – Serbia
- Bauxite Mines Jajce – Jajce – Bosnia and Herzegovina – (Diorit supplied machines for underground mining)
- Ričice tunnel and Pečuj tunnel – (Diorit supplied self-drilling anchors)
- Highway Bar-Boljare – Montenegro – (Diorit supplied rope anchors and Gewi® bars)
- GIM-Civil Institute Macedonia – Convector station project – Montenegro and other projects (Diorit supplied micropiles)
- Tunnel “1. March” – (Diorit supplied Atlas Copco drilling machine, drilling tools and spare parts) etc.
PRE-STRESSING WORKS
- Viaduct Ričice – Bosnia and Herzegovina
- Klopačka Stijene Viaduct – Bosnia and Herzegovina
- Klopče Viaduct – Bosnia and Herzegovina
- Viaduct Babina Rijeka – Bosnia and Herzegovina
- Zeleni Most in Gradiška – Bosnia and Herzegovina
- Most Čelinac – Bosnia and Herzegovina
- Bridge in Vukovar – Croatia
TRANSITIONAL DEVICE WORKS
- Drivuša Bridge – Bosnia and Herzegovina
- Čelinac Bridge – Bosnia and Herzegovina
- Bridge in Vukovar – Croatia
PRE-STRESSING WORK ON THE CONSTRUCTION OF THE BAR-BOLJARE HIGHWAY
Subcontractor for prestressing: Diorit Sarajevo
Bridges: Preljubovica, Kisjelica, Pelev Brijeg, Lutovo, Đurićev Laz, Ratkov Laz, Most Sitnica